What should I check before an FX5U online program change?
Confirm authorization, the correct PLC, a current backup, machine safe state, the exact change scope and a recovery plan before transferring anything.
Practical explanation
Mitsubishi safety guidance warns that program changes, parameter changes, forced outputs and RUN/STOP operations can affect the controlled system.
The person making the change must understand both the program and the machine hazards.
Check in this order
- 1Identify the correct CPU and machine.
- 2Back up and compare the running project.
- 3Inform affected operators and obtain permission.
- 4Control stored energy and unexpected motion.
- 5Verify operation and save the final revision.
Safety: Follow site lockout/tagout, commissioning and change-control procedures. Never force an output without understanding the physical consequence.
Last reviewed: 2 October 2026
Official source: MELSEC iQ-F FX5 User's Manual (Application) — Safety PrecautionsStill need help with your machine?